Wednesday, March 25, 2009

Week Ten of Construction of House #2

I don't have many pictures of construction this week. The garage door was installed. Insulation was blown into the attic and Victor spent all day Saturday on the Bobcat removing construction debris and leveling the yard in preparation for the driveway and the sidewalk to be poured. He also dug trenches for water and electrical lines and then installed these lines.

This is a pic of the front yard sans foundation form boards, excess drywall material, and piles of masonry sand and stone. Victor moved the big stuff with the power equipment and this pregnant lady and her little men handled the smaller junk. We made quite a picture I'm sure.
Nevertheless, we got the job done.

1 comment:

Anonymous said...

You're getting really close to the finished product, right??