Wednesday, February 25, 2009

Week Six of Construction on House #2

First came the insulation. This type of insulation is called bib.
A very thin layer of this material is tacked to the studs along all of the outer walls.



















Then this cotton-like stuff is blown into the cavity that is created.



















This is the end result.















Next came the drywall.





























By Saturday, the inside was all taped and floated.















..........and on the outside? They were painting!














They completely painted all of the siding and the fascia. Hurray!!

1 comment:

Mindi Tipps said...

I like the arch inside! Is that the living/dining room?